Introduction

The MBR900 job is used to update the Fulfill Status of membership orders and to populate a reporting table called Cus_Current_Membership_Info. This job updates the fulfill status of an order to “Expired”.  This is a TRS job that can be run manually or could be scheduled for a particular date each year. 

This batch process also has the ability to update orders to “Grace”, but since our grace period is now two months and we do not run this process until March, orders should no longer change to “Grace” as the fulfill status.

*** Personify recommends that this job be run monthly; however, we cannot do this because we have members add and drop throughout the year.

Batch Process

This batch process must be run in a linear fashion, affiliate by affiliate; it cannot be run concurrently. This process should be run annually following the Q4 suspension process (typically the second week in March).

Parameters include:                                                           

Parameter

Options

Description

Update Mode

Fulfillment, Membership or Both

Select Both.  This will update both the fulfill status and will also update or add a row in the Cus_Current_Membership_Info table.

Organization

(Read only)

This defaults to the active (logged in) organization

Organization Unit

(Read only)

This defaults to the active (logged in) organization unit

As of Date

Date

The end of the prior year should be selected.  **WARNING:  The prior year must be used to prevent expiration of orders which have terminated in the current year, prior to 12/31.  This will allow for easier reinstatement throughout the current year.

Reports

Reports include:

Name

Type

Description

MET_NOTMET

Crystal

This report lists all members, their AOA product and annual dues (prior to any adjustments), balances for each year, and the Credentialing requirement amount to meet for Credentialing.  It also shows, on the member level, whether or not they meet at the time the report was run (Y/N).  This is sent to all affiliates throughout March and April, with a final report going out in May.

 

Ran the job on 4/29/2016 to expire 2014 orders for each affiliate in production accordingly: